Navigating Contractual and Commercial Strategies for Energy Solutions in Data Centres to Avoid Over Reliance on the National Grid

Time: 10:00 am
day: Day One

Details:

• Assessing Innovative Energy Generation and Storage Contracts: Evaluating the commercial viability and contractual implications of adopting self-generative energy solutions to reduce reliance on traditional energy grids

• Integrating On-Site Battery Storage: Analyzing the complexities and commercial considerations of incorporating on-site battery storage to ensure continuous power supply during peak demands.

• Exploring Hybrid Energy Systems: Investigating the feasibility and contractual frameworks for hybrid energy systems that combine various generation methods to enhance resilience and efficiency in data centre operations